2019-A7 - Submarine cables installation
2019-A7-1
Installation engineering of export cables for offshore wind farm connections
2019-A7-2
Madeira-Porto Santo very high water depth submarine cable feasibility study
2019-A7-3
2019-A7-4
2019-A7-5
Submarine Cable Route Optimizing System Based on Marine Environmental Conditions
2019-A7-6
Fatigue- Creep in conductors and armouring as constraint for allowable installation depth