2019-A6 - HVDC submarine cables
2019-A6-0
2019-A6-1
Qualification, installation and commissioning of world´s first DC 400kV XLPE cable system
2019-A6-3
Design features of HVDC cables crossing the German North Sea EEZ
2019-A6-4
UK to Iceland HVDC Interconnector: Key Project Considerations
2019-A6-5
Continuous monitoring of HVDC Power cables with integrated fibre optic cables