c est bon! Jicable – International Conference on Insulated Power Cable Systems

2015-C5 - HV and EHV cable diagnosis

2015-C5-1

PDF Permanent PD monitoring experience on shanghai 500 kV power cable lines

JIANG Jun, GAO Xiaoqing, QIAN Tianyu Shanghai Electric Power Company , Shanghai, China

XIAO Chuanqiang, DAI Hongbin SINDIA , Beijing, China

2015-C5-2

PDF Effective on-site testing and non-destructive diagnosis of new installed and service aged HV (EHV) power cables up to 230 kV

MINASSIAN Rafael onsite hv solutions Americas Inc. , Toronto, Ontario, Canada

RAKOWSKA Aleksandra, SIODLA Krzysztof Poznan University of Technology , Poznan, Poland

GULSKI Edward, JONGEN Rogier onsite hv solutions ag , Luzern, Switzerland

PARCIAK Jaroslaw onsite hv solutions Central Europe Sp. Z o.o. , Warsaw, Poland

2015-C5-3

PDF Short-term partial discharge monitoring as a diagnostic tool on 400 kV XLPE cable

HABEL Markus IPH GmbH Berlin , Berlin, Germany

2015-C5-4

PDF Condition monitoring of electrical cables using line resonance analysis (LIRA)

FANTONI Paolo Wirescan AS , Vinterbro, Norway

2015-C5-5

PDF An alternative approach about fault location on HVAC and HVDC cables during commissioning and operation

BÖHME Frank, SCHIERIG Stefan, HENSEL Michael HIGHVOLT Prüftechnik Dresden GmbH , Dresden, Saxony, Germany