2015-A2 - HV: installation methods
2015-A2-1
2015-A2-2
Installation and commissioning of Patuxent river crossing (HDD, 1.4km) project in US
2015-A2-3
138 kV insulated cable system for temporary connection of transmission lines and substations
2015-A2-5
Non-offset design of cables in manhole considering the mechanical behavior of XLPE cables in duct
2015-A2-6
Study on thermal backfill materials for directly buried HV cables