2015-A1 - HV and EHV cable systems

2015-A1-1

PDF Worldwide experiences and challenges with EHV XLPE cable projects 330 kV to 500 kV

WEINLEIN Andreas, PETERS Ulrich, LAAGE Uwe, MEMMER Horst Südkabel GmbH , Mannheim, Baden Württemberg, Germany

2015-A1-2

PDF The network connection of Niehl 3 CCPP - The first 380 kV long-distance cable project in Germany since the Bewag projects in 2000

SCHELL Fabian FICHTNER , Stuttgart, Germany

UHLENKÜKEN Heinz Rheinische Netzgesellschaft , Cologne, Germany

2015-A1-3

PDF 138 kV cable system qualification to IEC 60840-2011 / ICEA S-108-720-2012 / AEIC CS-9-06 / IEEE 48-2009 / IEEE 404-2012

GANATRA Ravi CME Wire and Cable , Suwanee, USA

PERKEL Josh NEETRAC , Atlanta, Georgia, USA

UZELAC Milan G & W Electric , Chicago, USA

ZAMUDIO José Viakable , Monterrey, Mexico

2015-A1-4

PDF Qualification of a 150 kV transition joint for connecting external gas pressure three-core cable with extruded single core cables

VAN DOELAND Wouter Energy Solutions , Delft, The Netherlands

VAN ROSSUM Jos, BARTHOLOMEUS Robert, OLTMANS Maurice, GEENE Henk, BODEGA Riccardo Prysmian Netherlands B.V. , Delft, The Netherlands

ROSS Rob, MOUSAVI GARGARI Shirma TenneT , Arnhem, The Netherlands

2015-A1-5

PDF PQ test and first 230 kV cable system project in Mexico

MAXIMO Juan, SALDIVAR Candelario Viakable Operaciones , San Nicolas de los Garza, Mexico

2015-A1-6

PDF Cable installation in mountainous areas, example of a successful installation and service

BOSSE Anika, BÜSCHER Astrid, EWERT Walter nkt cables , Cologne, Germany

LACKNER Johannes, BRANDSTÖTTER Erich VERBUND Hydro Power GmbH , Vienna, Austria