2011-C10 - Cable installation
2011-C10-1
Investigation into the benefits of installing high operating temperature cables in tunnels
2011-C10-2
A new backfill material with an extremely high thermal conductivity
2011-C10-3
Backfill replacement saves underground transmission lines cost and postpones investments
2011-C10-4
2011-C10-5
Hybrid high capacity transmission circuits - Challenges for cables in series with EHV overhead lines