c est bon! Jicable – International Conference on Insulated Power Cable Systems

2011-C10 - Cable installation

2011-C10-1

PDF Investigation into the benefits of installing high operating temperature cables in tunnels

James PILGRIM, David SWAFFIELD, Paul LEWIN University of Southampton

Steve SWINGLER Southampton Dielectric Consultants

Francis WAITE, David PAYNE National Grid

2011-C10-2

PDF A new backfill material with an extremely high thermal conductivity

Raymund BÖING Heidelberg Beton

Hans-Peter MAY nkt cables GmbH

Joerg DIETRICH HeidelbergCement Geotechnik

Heinrich BRAKELMANN, Joerg STAMMEN University Duisburg-Essen

2011-C10-3

PDF Backfill replacement saves underground transmission lines cost and postpones investments

Athayde MACEDO, Carla DAMASCENO Ligth SESA

Geraldo de ALMEIDA, Luis ZANETTA University of Sao Paolo - USP

2011-C10-4

PDF Improved cooling of high voltage cables

Herbert NYFFENEGGER, Detlef WALD Brugg Kabel AG

Harry ORTON Orton International Consulting

2011-C10-5

PDF Hybrid high capacity transmission circuits - Challenges for cables in series with EHV overhead lines

Simon LLOYD Cable Consulting International

Glenn STAPLETON Powerlink Queensland