c est bon! Jicable – International Conference on Insulated Power Cable Systems

2007-A6 - HV and EHV Cables - Operating considerations

2007-A6-1

PDF FACTS for optimum utilisation of cable networks in power systems

GRÜNBAUM Rolf ABB Power Technologies AB , Vasteras, Finland

KARLSTRAND Johan ABB Power Systems , Karlskrona, Sweden

2007-A6-2

PDF Outsourcing preventive maintenance on underground power transmission cables

ALSHIBANI Salem M. Cable Maintenance Section Head, Ministry of Energy , Yarmouk, Kuwait

SHARAF Ahmad Senior Consulting Cable Engineer, Ministry of Energy , Yarmouk, Kuwait

2007-A6-3

PDF Failure prediction in 50 kV mass-insulated power cable systems

JONGEN Rogier A., MORSHUIS Peter H. F., SMIT Johan J. Delft University of Technology , Delft, The Netherlands

JANSSEN Anton L.J. Continuon Assetmanagement , Arnhem, The Netherlands

GULSKI Edward Ksandr , Delft, The Netherlands

2007-A6-4

PDF Fire hazard of MV / HV cables installed in tunnels

PHILIPPCZYK Christian NKT Cables GmbH , Köln, Germany

VENO-POULSEN Keld NKT Cables A/S , Asneas, Denmark

JOURNEAUX Terry, GRACIAS Doug Prysmian Cables & Systems , Eastleigh, United Kingdom

LOYENS Wendy Borealis AB , Stenungsund, Sweden

ROBINSON James Borealis Polymers NV , Mechelen, Belgium

2007-A6-5

PDF Dynamic rating systems in general and in a hybrid 150 kV transmission system

DE WILD Frank H., BOONE Wim KEMA Consulting , Arnhem, The Netherlands

Van DER GEEST Hans CONTINUON , The Netherlands

SMIT Jacco Nuon Tecno , Alkmaar, The Netherlands